Before the hydroelectric plants were built, the Upper Volga was a rather shallow river. In summer it became much shallower, to the delight of locals who wanted to relax on the soft sand, but this was a huge problem for shipping. Looking after the interests of shipowners (and not only theirs) was, of course, a priority. And so in 1935 construction of the Uglich Hydroelectric Power Plant began, carried out mostly by prisoners. In 1940 this marvel of Soviet thought and labor went into operation. With it came the Uglich Reservoir, which flooded vast areas upstream, wholly or partly submerging 213 settlements. In its day it was one of the largest hydroelectric plants in the country, and it played an important role in supplying Moscow with electricity during the Great Patriotic War, especially during the Battle of Moscow.